Closed Access
  • About
  • Examples

Files

displaying 1 - 1 items in total 1
Series Control Symbol Title Contents dates
A9641 124 Aperture cards in sequences: 2369/1C/0 Rompin Endau Project Malaysia to 2369/8C/28A Rompin Endau Project Malaysia; 2377/1C/3 Prestressed Pipe Plant China to 2377/1C/10 Prestressed Pipe Plant China; 2379/2C/0 Kedung Ombo Project Indonesia to 2379/Film86/24 Kedung Ombo Dam Irrigation Project Indonesia; 2381/1C/3 Metallurgic Advice to 2381/1C/6 Metallurgic Advice; 2384/1C/0 Lilongwe Water Supply Study Malawi to 2384/7C/15 Lilongwe Water Supply Malawi; 2386/1C/2 West Java Assistance Project Indonesia to 2386/4C/1A West Java Design Assistance Indonesia; 2387/1C/1 Harding Dam Construction Phase to 2387/3C/9A Harding Dam Project W.A.; 2391/1C/1 Fairfield Flood Mitigation Study to 2391/4C/9 Fairfield Flood Mitigation Study 1983 - 1988
  • Overview (current)
  • Files
  • Reasons
  • Ages
  • Series
  • Decisions
  • Harvests