A2618, DOCUMENTS 3551/10 TO 3553/8

Snowy Mountains Hydro Electric Authority (SMHEA) Reports on Geology, & Sources of Construction Materials of Talbingo Dam & Tumut 3 Power Station together with Schedule of Rates. Contracts for Tumut 3 Pressure Pipelines & Talbingo Dam Diversion Tunnel

closed

access status

on 1 January 2016
59.89041095890411

years old

based on date of earliest content
yes

in the open period

based on date of latest content
49

years since

the access decision was made
Details as harvested on 1 January 2016
Item barcode 227431
Part of series A2618
Control symbol DOCUMENTS 3551/10 TO 3553/8
Title Snowy Mountains Hydro Electric Authority (SMHEA) Reports on Geology, & Sources of Construction Materials of Talbingo Dam & Tumut 3 Power Station together with Schedule of Rates. Contracts for Tumut 3 Pressure Pipelines & Talbingo Dam Diversion Tunnel
Contents dates 1965 - 1967
Location Canberra
View on RecordSearch

Why is this file closed?

On 3 July 1975 it was decided that you could not see this file for the following reasons: